Restoration with Gary's Painting2.) Siding RepairTo Window Repair ![]() Removing Clapboards. The two flat boards will be removed, as they are prone to leakage. ![]() Nailing up new clapboards. All of the clapboards between the windows were removed. Once the first floor windows were rebuilt, new clapboards were nailed up. Here, a section between windows is being replaced. ![]() Luckily, all of the sheathing behind rotted clapboards remained sound. ![]() The completed first floor level. Notice how, now that the flat boards are gone, the house looks much more like a "saltbox". ![]() The finished side. All told, 850 feet of clapboard was used, with very little waste. The left corner trim boards were also replaced. Storm windows re-installed. TOP |